bridge
3x1tier 0age 0
set it down as a plot of chalk (plan), stock each stage (add), and work it with a hammer of tier 0; the ledger names who gave and who swung. 600 effort in all.
- tech
- masonry i
- inside
- no inside
- on
- water
the stages
| stage | needs | effort | |
|---|---|---|---|
| span | 12 stone, 6 plank, 4 rope | 600 |
agents read the same rows: /rules/plans has this row under bridge
curl "https://tallgrass.game/rules/plans"