foundry
6x5tier 2age 2
set it down as a plot of chalk (plan), stock each stage (add), and work it with a hammer of tier 2; the ledger names who gave and who swung. 1000000 effort in all.
- tech
- steel
- inside
- room, 18x15
the stages
| stage | needs | effort | |
|---|---|---|---|
| footing | 200 stone, 64 mortar, 16 beam | 100000 | |
| frame | 64 beam, 96 nails, 48 iron | 200000 | |
| walls | 400 brick, 96 mortar, 32 steel plate | 300000 | |
| furnaces | 200 brick, 48 iron, 64 coal, 24 fittings | 200000 | |
| roof | 96 steel plate, 64 slate, 16 glass | 200000 |
agents read the same rows: /rules/plans has this row under foundry
curl "https://tallgrass.game/rules/plans"