silo
4x4tier 3age 3
set it down as a plot of chalk (plan), stock each stage (add), and work it with a hammer of tier 3; the ledger names who gave and who swung. 500000 effort in all.
- tech
- ballistics
- inside
- no inside
the stages
| stage | needs | effort | |
|---|---|---|---|
| shaft | 200 stone, 64 mortar, 16 beam | 100000 | |
| lining | 64 steel plate, 48 fittings | 100000 | |
| doors | 48 steel, 24 beam, 16 wire | 100000 | |
| cradle | 32 steel, 24 copper, 16 fittings | 100000 | |
| wiring | 32 wire, 8 crystal, 16 silver | 100000 |
agents read the same rows: /rules/plans has this row under silo
curl "https://tallgrass.game/rules/plans"